MEMBER INTELLIGENCE

Public Construction Tracker

Massachusetts public construction pipeline, bid opportunities and material project changes.

Loading data…Connecting to AGC MA pipeline service
Projects tracked—Statewide + municipal sources
Known project value—Published values only
Known construction value—Where separately reported
Changes · 7 days—Material changes only
Actions
NEXT 90 DAYS

Bid Calendar

Posted procurement deadlines and forward bid windows from the public-project pipeline. Forecast dates are clearly distinguished from posted deadlines.

Next 30 days—Posted + forecast opportunities
Next 90 days—Current calendar window
Posted deadlines—Exact agency dates
Known value—Opportunities in the 90-day view
Posted active procurement deadline published by the ownerForecast agency-published estimate, future solicitation date or planning window; confirm before bidding
Actions
Forecast windows are planning intelligence, not bid notices. Always confirm scope, eligibility, dates and addenda with the issuing owner.
ROLLING 7-DAY DELTA

What Changed

Only material project, procurement, milestone, value or delivery changes are shown.

OFFICIAL DLS SCHEDULES

Find a Project Wage Schedule

Search for the project record, load the official DLS schedule, and choose the rates that apply on your estimate date.

Use the project-specific DLS schedule for bidding. Massachusetts prevailing wage schedules are issued for a particular project. Example town schedules are useful for estimating only and should not replace the schedule supplied by the awarding authority.
OFFICIAL PROJECT SCHEDULE

Search DLS project schedules

Search the Commonwealth's public reprint index, then load the official schedule rates into the calculator. If DLS does not expose the generated PDF directly, upload the official reprint PDF and the tracker will extract it.

Enter a wage request number or another search field.
NEED A TOWN ESTIMATE INSTEAD?

Example schedule by municipality

Useful for early estimating only. The project-specific DLS schedule still controls for bidding and payroll.

Why the project schedule matters: the example schedule is for estimating only. The project-specific schedule issued by DLS controls for bidding and payroll.
Ready to estimate?After loading rates, move to the calculator to add workers and hours.
PREVAILING WAGE ESTIMATOR

Labor Cost Calculator

Estimate crew cost using rates already loaded from an official DLS schedule or rates you enter manually.

Need rates first? Use to find a project-specific DLS schedule and load selected classifications here.
CREW ESTIMATOR

Calculate prevailing wage labor cost

Load rates from an official DLS schedule or enter them manually. The calculator keeps the DLS total rate separate from the employer's qualifying benefit contributions.

How overtime is estimated: the regular hourly rate is the DLS total rate minus allowable benefit contributions actually made by the employer. Overtime cash wages are estimated at 1.5× that regular rate. Benefit cost is then added separately for all entered hours. Confirm plan/CBA treatment for overtime hours.
Trade / classification Base wage DLS total rate Employer qualifying benefits / hr Workers ST hrs / worker OT hrs / worker Required cash ST / hr Required cash OT / hr Crew cost
Straight-time cash$0Required cash wages
Overtime cash$0Estimated at 1.5× regular rate
Benefit contributions$0Entered qualifying contributions
Estimated labor cost$0Cash + qualifying benefit cost
Data status & methodology
SOURCES

Statewide and municipal sources, one AGC view

The tracker normalizes project and procurement information published by DCAMM, MBTA, Massport, MSBA, MWRA and selected municipal capital plans. Source links remain attached to each record so members can verify the underlying agency information.

CHANGE DETECTION

Built around the delta

Nightly snapshots are compared field-by-field. Routine source refreshes and cosmetic edits are suppressed while commercially meaningful changes are elevated.

DATA QUALITY

Conservative by design

Missing values are left blank rather than estimated. A one-day disappearance is flagged for verification, not treated as a cancellation. Partial collector runs cannot replace the latest complete baseline.

BID CALENDAR

Posted dates vs. forecasts

The Bid Calendar distinguishes exact owner-published deadlines from anticipated bid quarters or windows. Forecasts are planning intelligence; contractors should confirm requirements, dates, scopes and eligibility directly with the issuing owner.